![]() This is where one can find the sheet title and number. ![]() The bottom of the title block contains the sheet information. Changes to the drawings are indicated with revision clouds which surround the changes and note the revision number when the change occurred. This is where the drawing version and date are indicated. Construction documents are often changed throughout the project and drawings are updated and issued multiple times. This will include a name and address for the project as well as the revision information. ![]() Further down on the sheet is the project information. That is, a 1mm measurement taken on the drawing represents a 100mm length of the real-world object. A scale of 1:100 is a very common scale to use for a structural framing plan. The project team is listed at the top of the sheet - this is where all the contact information for the various engineers and consultants on a project is listed. In order for structural drawings to fit on a manageable sized drawing sheet, the drawing is usually a small fraction of the real-world size. Architecture drawings are big (24” x 36”) and sheets can contain many drawings.Īll the information in a title block is along the right hand side because construction documents are bound along the left side and this allows one to flip through drawings easily. Most title blocks incorporate a grid using numbers and letters along the sides that are used to reference where a drawing is on a sheet. The title block is a border on the sheet that contains project information and provides basic sheet organization. THE DRAWINGS REPRESENT THE SUPPORTING STURCTURE FOR AN OPERABLE PARTITION, EXISTING FRAMING REINFORCING (JOISTS, JOIST GIRDERS, AND STELL BEAMS), NOT THE METHOD OF CONSTRUCTION. Every sheet in a set of construction documents has a title block.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |